The project will increase the Van Wyck Expressway capacity between the Kew Gardens Interchange and JFK Airport. It will also address operational, geometric, and structural deficiencies on the expressway.
Some challenges include creating the bond zone in dense sand and working closely with the general contractor, their consultant, and NYSDOT to meet the tight project schedule.
As of October 2023, Tri-State has reached about the halfway point of the micropile and drilled-shaft scope after installing more than 150 micropiles to support the new bridge abutments and sewer structures and drilling hundreds of drilled-shaft locations for the new retaining wall and noise barriers. We have also successfully performed six high-capacity verification load tests and six proof load tests.