The initial dewatering process encountered a significant challenge in the form of corrosive brackish water, which caused damage to the treatment system equipment. In response to this issue, the team had to devise a solution that involved designing and reinstalling valves, pumps, and fittings that were resistant to salt water. This proactive approach was necessary to ensure the efficient and effective operation of the system, ultimately allowing for its successful restoration and functionality.